
“Due to past failures, there are some who may be sceptical but, as they say, ‘the train has left the station’ and this project is on its way,” Mr Pinto said. The resort’s restaurant/retail precinct is due to reopen in mid-July following repairs as well as dredging of the heavily silted harbour and rebuilding the 266-berth marina. Apparently Sky was aware of a lot of the bad stuff going on but did nothing to stop it. When the floodgates opened on all the horrible stuff started to get out, Sky seemed to have panicked.
Sky williams syndicate project plus#
He said the syndicate’s $4m initial investment included $500,000 on restoring the sewerage treatment plant, more than $2m on the grounds and marina village, commercial building, street lighting and public access, plus $750,000 on masterplan designs and consultation. Answer: Sky has a house where he will rent out rooms to members of the Smash community. Mr Pinto said the masterplanned project would become one of Australia’s finest, safe-haven destinations with easy access to Cassowary Coast fishing and boating spots. The syndicate took possession of the resort and marina property last year and is preparing to settle on its $3m purchase from liquidator FTI Consulting in coming weeks.Īrchitects DBI Design are to design the renamed Hinchinbrook Harbour and Resort.
Lewis Cohen and Stephan Pinto already have spent $4m on improvements at the resort which was battered by cyclone Yasi in 2011. Two US businessmen have established a private Australian syndicate The Passage Holdings to steer the venture through a 10-year staged program to include 600 extrahomes, a new marina and family resort. Once a League of Legends and Super Smash Bros. THE embattled Port Hinchinbrook project is to be transformed into a $450 million tourism draw card at Cardwell.
